PK Yonge Robotics lab renovation
gainesville, Florida
This project consisted of a renovation of two existing classrooms at PK Yonge Research & Developmental School. CSEI provided the design of mechanical and electrical systems to support this renovation. The existing Bard unit was replaced with a new unit with improved capacity and humidity control to meet all new loads as well as provide the code required ventilation for the new space usages and equipment. On the electrical side, existing branch circuits were reconfigured to supply all new equipment loads and general power needs including cord reels in one of the classrooms.

