UF Aquatic Pathobiology
Gainesville, Florida
The Problem:
The existing HVAC System was failing and needed replacement on an emergency basis.
Our Solution:
CSEI responded rapidly to provide a review of the situation and a proposal to our UF project manager under our continuing contract so that the design (and subsequent equipment replacement) could happen as quickly as possible.
The CSEI DIfference:
Our internal systems and procedures are built to ensure our ability to provide market-leading responsiveness to our Clients, whether that is during design, construction, or for a new project that is time-sensitive. We pride ourselves on our ability to react quickly and effectively in situations like this project, but are continuously looking at ways to improve and add efficiency.